What Should Oil + Gas Buyers Check Before Ordering Cast Components?
Most casting disputes are decided before the purchase order is issued. An unstated design temperature, an inspection scope written as
Most casting disputes are decided before the purchase order is issued. An unstated design temperature, an inspection scope written as
Most NDT disputes come from one line in a purchase order: “NDT as per standard.” It names no method, no
Porosity is the defect that hides. A casting can pass every dimension, look flawless on the outside, and be full
A cast valve body that leaks at 900 psi does not fail quietly. It shuts a line, triggers an incident
Introduction Equipment failure in an oil and gas facility rarely happens at a convenient time. A valve body cracks during
Introduction A casting can look flawless on the outside and still fail catastrophically under load. That’s the uncomfortable truth about